Construction calculator

Floor screed calculator

Calculate the floor screed compound quantity needed, number of bags and an estimated drying time — with support for a slope (min/max thickness).

If the thickness is the same everywhere, enter the same value in both fields.
Average thickness0 mm
Volume0.00 m³
Weight0.00 kg
Number of bags0 pcs
Estimated drying time—
Formula

How it's calculated

StepFormula
Average thickness(Min. thickness + Max. thickness) ÷ 2
VolumeArea × Average thickness
WeightVolume × compound density
Number of bagsWeight ÷ bag weight, rounded up

The min/max thickness fields are for calculating a slope (e.g. for a balcony or rainwater drainage) — the compound layer can be thinner on one side than the other.

Frequently asked questions

FAQ

What's the difference between self-leveling and cement screed?

Self-leveling compound spreads itself once poured, dries faster (~1 day/10mm), but costs more. Cement screed needs manual leveling with a trowel, dries slower (~7 days/10mm), but is cheaper.

When should I use a lightweight (thermal insulating) compound?

When you need a thick layer (e.g. a large floor level rise) without adding extra load to the structure — it's significantly lighter, but takes the longest to dry.

Do I need to prime the substrate before pouring the compound?

Yes, almost always — primer improves adhesion and prevents the substrate from absorbing moisture too quickly. The amount of primer is not included in this calculator.